Paving

  • Pulverizing, milling and paving Autoroute Laurentienne
  • Paving the Val-Bélair sector of Autoroute Henri IV
  • Paving Highway 70 from Chicoutimi to Saint-Bruno (excluding the Saint-Dominique sector)
  • Paving runway 06-24, the intersection of runway 12-30 and numerous taxiways at the Jean-Lesage Airport in Quebec City
  • Paving the Gagnonville airport
  • Pulverizing, milling and paving urban roads in many Quebec municipalities
  • Pulverizing, milling and paving many portions of highways 175, 155, 169, 170, 172, 138, 381 and 389
  • Paving the Provigo distribution centre in Quebec City
  • Paving Autoroute de la Capitale in Quebec City and Beauport
  • Paving Autoroute Dufferin-Montmorency
  • Paving Autoroute Charest in Quebec City from Sainte-Foy to Saint-Augustin
  • Completing numerous commercial paving contracts
  • Paving the Cabano-Kingsway warehouse yard in Quebec City
  • Laying down roller compacted concrete in the storage yard of American Iron and Metals in Montreal


Civil engineering

  • Building the PK20-PK30 portion of the permanent access road to the SM3 hydroelectric project
  • Building a bridge over the Béline River in Rivière Saint-Jean
  • Rebuilding Chemin des Coteaux in L’Anse-Saint-Jean
  • Building the temporary access road and excavating the water intake for the SM3 hydroelectric project (subcontractor for Pomerleau Inc.)
  • Earthwork for runways 12-30 and 06-24 at the Jean-Lesage airport in Quebec City
  • Closing the landfill site in Laterrière (Fjord-du-Saguenay regional county municipality)
  • Sewer and water work and building sewage ponds in Hébertville-Station
  • Earthwork and paving Highway 381 in Ferland-Boileau
  • Earthwork and paving kilometres 142 to 146 of Highway 175
  • Earthwork and paving the Saint-Mathias sector of Highway 70 in Jonquière
  • Water and road work in two sectors of Shannon
  • Sewer and water work in the Ferguson beach sector of Sept-Îles
  • Building a bridge over the Couture River in Sheldrake
  • Sewer, water and road work for five streets in Val-Bélair, Charlesbourg and Beauport
  • Expanding the Havre-Saint-Pierre marina
  • Extending the penstock steel linings at the Toulnustouc hydroelectric project
  • Earthwork, draining and paving Autoroute Henri IV and Highway 573 in Val-Bélair
  • Building cofferdams, platform backfilling and excavating the spillway (phase 1) of  the Péribonka IV hydroelectric project
  • Excavation and concrete work for penstocks and the water intake at the Péribonka IV hydroelectric project
  • Excavation and preliminary backfilling work for the cutoff wall of the Péribonka IV hydroelectric project (subcontractor for Bauer Fondation Canada Inc.)
  • Earthwork, draining and building two bridges over the Cyriac River and paving kilometres 208 to 215 of Highway 175


Drilling and blasting

  • Drilling and blasting 1.5 million cubic metres of rock during the excavation of the spillway (Phase 1) of the Péribonka IV hydroelectric project
  • Drilling and blasting the headrace canal and water intake for the Péribonka IV hydroelectric project
  • Drilling and blasting the access road for the water intake of the Péribonka hydroelectric project
  • Drilling and blasting to backfill the bridge at kilometre 124 of Chemin de la Chute-des-Passes
  • Drilling and blasting 350,000 cubic metres of rock for kilometres 208 to 215 of Highway 175 (expansion to 4 divided lanes)
  • Drilling and blasting 2 million metric tons in Groupe Riverin’s various quarries on an annual basis

 

List of major work in which Inter-Cité and its subsidiaries have been involved in recent years.