 |
 |
Paving
- Pulverizing, milling and paving Autoroute Laurentienne
- Paving the Val-Bélair sector of Autoroute Henri IV
- Paving Highway 70 from Chicoutimi to Saint-Bruno (excluding the Saint-Dominique sector)
- Paving runway 06-24, the intersection of runway 12-30 and numerous taxiways at the Jean-Lesage Airport in Quebec City
- Paving the Gagnonville airport
- Pulverizing, milling and paving urban roads in many Quebec municipalities
- Pulverizing, milling and paving many portions of highways 175, 155, 169, 170, 172, 138, 381 and 389
- Paving the Provigo distribution centre in Quebec City
- Paving Autoroute de la Capitale in Quebec City and Beauport
- Paving Autoroute Dufferin-Montmorency
- Paving Autoroute Charest in Quebec City from Sainte-Foy to Saint-Augustin
- Completing numerous commercial paving contracts
- Paving the Cabano-Kingsway warehouse yard in Quebec City
- Laying down roller compacted concrete in the storage yard of American Iron and Metals in Montreal
Civil engineering
- Building the PK20-PK30 portion of the permanent access road to the SM3 hydroelectric project
- Building a bridge over the Béline River in Rivière Saint-Jean
- Rebuilding Chemin des Coteaux in L’Anse-Saint-Jean
- Building the temporary access road and excavating the water intake for the SM3 hydroelectric project (subcontractor for Pomerleau Inc.)
- Earthwork for runways 12-30 and 06-24 at the Jean-Lesage airport in Quebec City
- Closing the landfill site in Laterrière (Fjord-du-Saguenay regional county municipality)
- Sewer and water work and building sewage ponds in Hébertville-Station
- Earthwork and paving Highway 381 in Ferland-Boileau
- Earthwork and paving kilometres 142 to 146 of Highway 175
- Earthwork and paving the Saint-Mathias sector of Highway 70 in Jonquière
- Water and road work in two sectors of Shannon
- Sewer and water work in the Ferguson beach sector of Sept-Îles
- Building a bridge over the Couture River in Sheldrake
- Sewer, water and road work for five streets in Val-Bélair, Charlesbourg and Beauport
- Expanding the Havre-Saint-Pierre marina
- Extending the penstock steel linings at the Toulnustouc hydroelectric project
- Earthwork, draining and paving Autoroute Henri IV and Highway 573 in Val-Bélair
- Building cofferdams, platform backfilling and excavating the spillway (phase 1) of the Péribonka IV hydroelectric project
- Excavation and concrete work for penstocks and the water intake at the Péribonka IV hydroelectric project
- Excavation and preliminary backfilling work for the cutoff wall of the Péribonka IV hydroelectric project (subcontractor for Bauer Fondation Canada Inc.)
- Earthwork, draining and building two bridges over the Cyriac River and paving kilometres 208 to 215 of Highway 175
Drilling and blasting
- Drilling and blasting 1.5 million cubic metres of rock during the excavation of the spillway (Phase 1) of the Péribonka IV hydroelectric project
- Drilling and blasting the headrace canal and water intake for the Péribonka IV hydroelectric project
- Drilling and blasting the access road for the water intake of the Péribonka hydroelectric project
- Drilling and blasting to backfill the bridge at kilometre 124 of Chemin de la Chute-des-Passes
- Drilling and blasting 350,000 cubic metres of rock for kilometres 208 to 215 of Highway 175 (expansion to 4 divided lanes)
- Drilling and blasting 2 million metric tons in Groupe Riverin’s various quarries on an annual basis
|
 |
 |